Public Works

Responsibilities

The City of Danville Public Works Department maintains much of the infrastructure within the City including:

  • Beautification : Landscaping on City property
  • Streets and Roads : All public streets within the City limits except those maintained by the State
  • Parks : Six total including Henry Jackson, Batewood, Cowan Street, Henson, Weisiger, and Lexington Avenue
  • Facilities : Six total
  • Fleet : Approximately 90 pieces of equipment and vehicles

Projects

Downtown Streetscape Improvements
This project involves the improvement of all downtown curbs, sidewalks, street lights and stoplights. The City of Danville Streetscape Master Plan was approved in 2007, and the first phase of the project has been completed. The State Transportation Cabinet has announced that Danville has received $273,000 to execute the second phase and the project is currently in the design phase. Check below for updates, and descriptions for each Phase.

  • Phase One
    • Location: North side of Main from First to Second, west side of Second from Main to Broadway, All four corners of the intersection of Main and Second
    • Project Status: Completed
    • Consulting Engineer: FRA Engineering, Danville
    • General Contractor: Hil-Don, Inc., Burkesville
  • Phase Two
    • Location: Both sides of North Third Street from Main to Broadway, east side of North Second from Main to Broadway
    • Project Status: Project is currently advertised for bids for Construction Services and the groundbreaking should be in early November. Click below to view the Final Construction Plans.
    • Consulting Engineer: Design work completed by the City
    • General Contractor: To be determined